Waterproof floor and shower
Bathroom |
Qty 1.00 allowance
|
$1,550.00 |
|
|
|
|
$0.00 |
$-1,550.00 |
|
|
Remove existing bathroom fittings
Demolition |
Qty 1.00 allowance
|
$375.00 |
|
|
|
|
$0.00 |
$-375.00 |
|
|
Waste disposal allowance
Demolition |
Qty 1.00 each
|
$600.00 |
|
|
|
|
$0.00 |
$-600.00 |
|
|
Re-line bathroom walls
Framing |
Qty 1.00 allowance
|
$675.00 |
|
|
|
|
$0.00 |
$-675.00 |
|
|
Tile bathroom floor and shower walls
General |
Qty 9.00 m2
|
$4,500.00 |
|
|
|
|
$0.00 |
$-4,500.00 |
|
|
Install new vanity
General |
Qty 3.00 hours
|
$225.00 |
|
|
|
|
$0.00 |
$-225.00 |
|
|
Install new toilet
General |
Qty 5.00 hour
|
$375.00 |
|
|
|
|
$0.00 |
$-375.00 |
|
|
Toilet
General |
Qty 1.00 each
|
$750.00 |
|
|
|
|
$0.00 |
$-750.00 |
|
|
Vanity
General |
Qty 1.00 each
|
$560.00 |
|
|
|
|
$0.00 |
$-560.00 |
|
|