← Back to Customers

Cost Library

Add Cost Item

Clear
Showing 49 cost items.
Category Item Unit Material Unit Cost Labour Hours / Unit Subcontractor Other Waste % Status
Concrete Concrete footing
Concrete footing allowance including boxing and placing.
m $75.00 0.60 $0.00 $0.00 5.00% Active Edit | Delete
Concrete Concrete Foundations each $45.00 1.00 $0.00 $0.00 0.00% Active Edit | Delete
Concrete Concrete path m2 $85.00 2.00 $0.00 $0.00 0.00% Active Edit | Delete
Concrete Concrete supply and place
Supply, place and finish standard concrete.
m2 $95.00 0.45 $0.00 $0.00 5.00% Active Edit | Delete
Decking Deck framing
Supply and install deck subfloor framing.
m2 $95.00 1.20 $0.00 $0.00 10.00% Active Edit | Delete
Decking Deck handrail / balustrade
Supply and install timber handrail or balustrade.
m $95.00 0.80 $0.00 $0.00 10.00% Active Edit | Delete
Decking Hardwood decking installed
Supply and install hardwood decking boards.
m2 $145.00 1.30 $0.00 $0.00 10.00% Active Edit | Delete
Decking Pine decking installed
Supply and install pine decking boards.
m2 $85.00 1.10 $0.00 $0.00 8.00% Active Edit | Delete
Demolition Bathroom strip-out allowance
Strip out bathroom fittings, linings and general bathroom components.
allowance $0.00 8.00 $0.00 $0.00 0.00% Active Edit | Delete
Demolition General demolition labour
Remove existing fittings, linings or fixtures
hour $0.00 1.00 $0.00 $0.00 0.00% Active Edit | Delete
Demolition General demolition labour
Remove existing fittings, linings, fixtures or minor building elements.
hour $0.00 1.00 $0.00 $0.00 0.00% Active Edit | Delete
Demolition Remove existing floor coverings
Remove existing flooring, carpet, vinyl or similar floor covering.
m2 $0.00 0.15 $0.00 $0.00 0.00% Active Edit | Delete
Demolition Remove existing wall linings
Remove existing plasterboard or wall lining ready for replacement.
m2 $0.00 0.25 $0.00 $0.00 0.00% Active Edit | Delete
Electrical Bathroom electrical allowance
Allowance for bathroom electrical alterations or fit-off.
allowance $0.00 0.00 $850.00 $0.00 0.00% Active Edit | Delete
Flooring Floor levelling allowance
Allowance for minor floor levelling or preparation.
m2 $18.00 0.20 $0.00 $0.00 5.00% Active Edit | Delete
Flooring Vinyl plank flooring installed
Supply and install vinyl plank flooring.
m2 $65.00 0.45 $0.00 $0.00 8.00% Active Edit | Delete
Framing Ceiling framing / battens
Supply and install ceiling framing or battens.
m2 $35.00 0.45 $0.00 $0.00 10.00% Active Edit | Delete
Framing Timber floor framing
Supply and install timber floor framing.
m2 $85.00 1.10 $0.00 $0.00 10.00% Active Edit | Delete
General Builder labour
General builder labour.
hour $0.00 1.00 $0.00 $0.00 0.00% Active Edit | Delete
General Contingency allowance
Allowance for minor unknowns and small scope uncertainty.
allowance $0.00 0.00 $0.00 $500.00 0.00% Active Edit | Delete
Hardware Fixings and fasteners allowance
Allowance for screws, nails, bolts, brackets and general fixings.
allowance $150.00 0.00 $0.00 $0.00 0.00% Active Edit | Delete
Hardware Sealants and adhesives allowance
Allowance for sealants, adhesives, tapes and consumables.
allowance $120.00 0.00 $0.00 $0.00 0.00% Active Edit | Delete
Insulation Ceiling insulation
Supply and install ceiling insulation.
m2 $22.00 0.18 $0.00 $0.00 5.00% Active Edit | Delete
Insulation Wall insulation
Supply and install wall insulation.
m2 $18.00 0.15 $0.00 $0.00 5.00% Active Edit | Delete
Internal Linings Stopping allowance
Allowance for plasterboard stopping and finishing.
m2 $0.00 0.00 $22.00 $0.00 0.00% Active Edit | Delete
Joinery Cabinetry installation allowance
Install supplied cabinetry or joinery items.
allowance $0.00 6.00 $0.00 $0.00 0.00% Active Edit | Delete
Joinery Shelving allowance
Build or install basic shelving.
m $45.00 0.60 $0.00 $0.00 10.00% Active Edit | Delete
Kitchen Benchtop installation allowance
Allowance for benchtop installation or subcontractor install.
allowance $0.00 0.00 $950.00 $0.00 0.00% Active Edit | Delete
Kitchen Kitchen removal allowance
Remove existing kitchen cabinets, benchtop and associated fittings.
allowance $0.00 8.00 $0.00 $0.00 0.00% Active Edit | Delete
Painting Exterior painting
Labour and materials for standard exterior painting.
m2 $28.00 0.35 $0.00 $0.00 5.00% Active Edit | Delete
Painting Paint doors and trims
Paint internal doors, skirtings, architraves and trims.
m $8.00 0.15 $0.00 $0.00 5.00% Active Edit | Delete
Plumbing Bathroom plumbing rough-in
Subcontractor allowance for bathroom plumbing rough-in.
allowance $0.00 0.00 $1,200.00 $0.00 0.00% Active Edit | Delete
Plumbing Fit off bathroom fixtures
Subcontractor allowance for fitting off bathroom fixtures.
allowance $0.00 0.00 $850.00 $0.00 0.00% Active Edit | Delete
Plumbing Plumbing allowance
General plumbing allowance for small works.
allowance $0.00 0.00 $650.00 $0.00 0.00% Active Edit | Delete
Preliminaries Site setup allowance
General setup, access preparation, protection and initial site organisation.
allowance $0.00 0.00 $0.00 $250.00 0.00% Active Edit | Delete
Preliminaries Travel / mobilisation allowance
Allowance for travel, loading, unloading and mobilisation.
allowance $0.00 0.00 $0.00 $150.00 0.00% Active Edit | Delete
Roofing Corrugated roofing installed
Supply and install corrugated roofing sheets.
m2 $65.00 0.65 $0.00 $0.00 10.00% Active Edit | Delete
Site Works Ground preparation
General ground preparation, levelling and minor excavation.
m2 $5.00 0.20 $0.00 $0.00 0.00% Active Edit | Delete
Site Works Post hole digging
Dig post holes for deck, fence, pergola or similar structure.
each $5.00 0.40 $0.00 $0.00 0.00% Active Edit | Delete
Site Works Timber retaining allowance
Allowance for minor timber retaining or garden edge structure.
m $65.00 0.75 $0.00 $0.00 10.00% Active Edit | Delete
Subcontractors Engineering allowance
Allowance for engineering input if required.
allowance $0.00 0.00 $1,200.00 $0.00 0.00% Active Edit | Delete
Tiling Tile trim allowance
Allowance for tile trims and finishing edges.
m $12.00 0.10 $0.00 $0.00 5.00% Active Edit | Delete
Tiling Wall tiling
Supply and/or install wall tiles, excluding premium tile supply unless specified.
m2 $45.00 0.85 $0.00 $0.00 10.00% Active Edit | Delete
Waste Site clean-up labour
General labour for site clean-up.
hour $0.00 1.00 $0.00 $0.00 0.00% Active Edit | Delete
Waste Waste disposal allowance
Skip bin, trailer runs or waste removal allowance.
allowance $0.00 0.00 $350.00 $0.00 0.00% Active Edit | Delete
Waterproofing Shower waterproofing allowance
Waterproof shower walls and base area.
allowance $250.00 2.00 $0.00 $0.00 5.00% Active Edit | Delete
Windows and Doors Install exterior door
Install standard exterior door and hardware.
each $350.00 2.50 $0.00 $0.00 5.00% Active Edit | Delete
Windows and Doors Install internal door
Install standard internal door and hardware.
each $120.00 1.50 $0.00 $0.00 5.00% Active Edit | Delete
Windows and Doors Install window unit
Install supplied window unit.
each $100.00 2.00 $0.00 $0.00 5.00% Active Edit | Delete