← Back to Estimate
Edit Line Item
Estimate:
Initial Estimate
Job: Repair Greenhouse
Customer: Donna
Section
Item Name
Description
Allowance only if structural advice or engineering input becomes necessary for the truss roof or concrete floor scope.
Quantity
Unit
Each
Allowance
Hour
Day
Metre
Lineal metre
Square metre
Cubic metre
Kilogram
Tonne
Sheet
Pack
Lot
Item
Material Unit Cost
Labour Hours / Unit
Subcontractor Cost
Other Cost
Line Notes
Only include if needed; builder to decide.
Save Changes
Cancel